Commercial roofing tender review

KNOW THE SCOPE. CHECK THE SOURCE.

A concise first pass through the roofing scope, with the pages behind every important finding.

RoofPrecon organizes project details, roof assemblies, materials and open questions so an estimator can review the tender before pricing it.

See an example
Source linkedMissing items visibleEstimator controlled
EXAMPLE TENDER / ILLUSTRATIVE PREVIEW
ESTIMATOR REVIEW
PROJECT

Example roof replacement

Project details and closing date: check tender sources

SCOPE
VIEW
Project detailsAt a glanceNames, dates, contacts
Roof systemsSeparateDeck upward
ConflictsFlaggedBoth sources retained
MaterialsListedQuantities if supported
ReviewHumanBefore any client report
ROOF ASSEMBLIESDECK → SKY
R1 Main roofExisting / removal / proposed layersView
R2 CanopySeparate area and materialsView
EXAMPLE REVIEW FLAG

INSULATION DETAIL

If a roof plan and specification disagree, both references appear and a draft RFI stays open for estimator review.

Source conflictDraft RFI
01 / FIRST PASS

THE ROOFING SCOPE, LAID OUT.

Short descriptions you can scan, followed by the exact tender page when you need to verify a detail.

01PROJECT DETAILS & CONTACTS
02ASSEMBLIES & MATERIALS
03CONFLICTS, GAPS & RFIs
02 / WORKFLOW

FROM PDF TO REVIEW PACK.

Document coverage is checked first. The estimator keeps control of corrections, sign-off and pricing.

01REQUEST

Tell us about the tender. We provide secure document instructions.

02ANALYZE

RoofPrecon builds a source-linked scope overview.

03REVIEW

An estimator checks sources, gaps and draft RFIs.

04DELIVER

Share a reviewed HTML or PDF snapshot. Budget appears only with a documented basis.

03 / ILLUSTRATIVE EXAMPLE

WHEN SOURCES DISAGREE, SEE BOTH.

This is a fictional example of how a scope conflict appears. A live report links each finding to its actual PDF page, sheet or specification paragraph. Missing information stays missing.

EXAMPLE: INSULATION THICKNESSCONFLICT
SPECIFICATION · EXAMPLE3 in. ISOSource reference would appear here
DRAWING · EXAMPLE4 in. ISOSource reference would appear here
ESTIMATOR ACTIONCheck both pages; draft an RFI

Illustrative interface only. No project result or cost is claimed.

04 / OPTIONS

GO DEEPER WHEN IT HELPS.

The first overview is for scope review. Additional research and training are separate choices.

TENDER OVERVIEW

Project facts, assemblies, materials and questions with document references. Ask us about one tender to get started.

MANUFACTURER & WARRANTY RESEARCH

CAD $299 per tender. Request a comparison of membrane systems, compatible components and warranty requirements for estimator review. No purchase occurs through this page.

FREE AI WORKFLOW SESSION

A 30-minute conversation about applying AI to one estimating or preconstruction workflow, with human review boundaries.

05 / HUMAN CONTROL

THE ESTIMATOR DECIDES.

RoofPrecon does not approve quantities, substitutions, pricing, warranty eligibility or a bid on your behalf.

ROOFPRECONFINDDocument evidence and gaps
ROOFPRECONSTRUCTUREAssembly, materials and draft RFIs
HUMAN GATEREVIEWEstimator checks and corrects
OUTPUTSHAREReviewed snapshot or export
06 / NEXT TENDER

START WITH ONE ROOF.

Tell us what you are reviewing. We’ll respond with the next step for secure document intake.

No automatic bid submissionNo guessed quantitiesHuman review required

REQUEST A REVIEW

Tell us about the job. This form accepts contact details only; we’ll reply with secure instructions for tender PDFs.

REQUEST A DEMO

Tell us what you want to see. We’ll reply to arrange a time.